Advertisement

Ad promo image large
  • Published Date

    September 30, 2022
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

Attention Land Owners & Contractors Land owners and contractors MPCA Requires a Pre-renovation or Demolition Requirement for any institutional, commercial, public, industrial or residential structure, installation or building (This includes any structure or building containing condominiums or individual dwellings operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units.) Refer to the MPCA website for the most updated information. · Need to have an Asbestos inspection done by a qualified inspector. Must notify MPCA 10 days prior to Demolition. · Must do a Pre-Demolition Environmental Checklist Pre-renovation or Demolition Requirements (Residential) Common wastes that must be removed before demolition (Good Practice use the Pre-Demolition Environmental Checklist on the MPCA Website), an asbestos inspection is not required. If you are still concerned about asbestos you can have the structure inspected but there is no requirement to submit paperwork to MPCA for residential building having four or fewer dwelling units. · Appliances · Asbestos · Electronics · Environmental and safety controls · Hazardous Waste · Lead-containing items · Lighting Components Oils · Refrigerants and halons · Solid Waste · Submersible well pumps See MPCA Demo Checklist on the MPCA Website: https://www.pca.state.mn.us/waste/construction-and-demolition-waste Attention Land Owners & Contractors Land owners and contractors MPCA Requires a Pre-renovation or Demolition Requirement for any institutional, commercial, public, industrial or residential structure, installation or building (This includes any structure or building containing condominiums or individual dwellings operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units.) Refer to the MPCA website for the most updated information. · Need to have an Asbestos inspection done by a qualified inspector. Must notify MPCA 10 days prior to Demolition. · Must do a Pre-Demolition Environmental Checklist Pre-renovation or Demolition Requirements (Residential) Common wastes that must be removed before demolition (Good Practice use the Pre-Demolition Environmental Checklist on the MPCA Website), an asbestos inspection is not required. If you are still concerned about asbestos you can have the structure inspected but there is no requirement to submit paperwork to MPCA for residential building having four or fewer dwelling units. · Appliances · Asbestos · Electronics · Environmental and safety controls · Hazardous Waste · Lead-containing items · Lighting Components Oils · Refrigerants and halons · Solid Waste · Submersible well pumps See MPCA Demo Checklist on the MPCA Website: https://www.pca.state.mn.us/waste/construction-and-demolition-waste